Butcher: 98% of the first sector is completed in the People of Egypt Walk and 80%

Dr. Assem Al-Jazzar, Minister of Housing, Utilities and Urban Communities, reviewed the executive position of a number of development projects being implemented in Cairo Governorate, including (the development of Lake Ain El-Sira area – People of Egypt walkway – Maspero Triangle area – the wall of the course of El-Ayoun), as part of the state’s efforts President Abdel Fattah El-Sisi took over to develop the capital and enable it to restore its historical, civilizational and cultural role.

Dr. Assem Al-Jazzar said: The implementation of the Ain Al-Sira area development project is underway, and the percentage of implementation of some works in the project has reached 95%. , Sitting areas and pergolas in the tongue area.

The Minister of Housing added: The people of Egypt walkway project is being implemented on the Nile Corniche, and the overall completion rate for works in the first sector reached 98%, and the first phase of the walkway includes the following: a individuals walkway with graded levels along the Corniche with a length of 4.7 km, 5 restaurants, and 5 cafeterias. And 62 shops, 3 garages with a total capacity of 180 cars, 3 runways with a total length of 315 meters and a capacity of 1240 people, and a theater of 275 square meters with a capacity of 772 people, in addition to the landscaping works, terraces and water fountains.

The minister explained that the percentage of completion of the second sector of the People of Egypt Walkway project on the Nile Corniche, with a length of 3.2 km, reached 35%, and the sector includes the southern part (Qasr El Nil Bridge to October Bridge with a length of 0.8 km – October Bridge to May 15 Bridge with a length of 1.1 km. ), And the northern part (Imbaba Bridge to the Coast Bridge with a length of 1.3 km), which includes a graded individuals’ walkway along the Corniche with a length of 3.1 km, the average width of the upper walkway is 4.5 m and the average width of the lower walkway is 6.5 m, and 19 buildings (floating restaurant – 3 cafeterias – 63 shops) Commercial – 7 buildings for services), 9 terraces with a total area of ​​638 square meters and accommodate 2552 people, two theaters with a total area of ​​425 square meters with a capacity of 1700 people, in addition to site coordination works, terraces and water fountains.

Dr. Assem Al-Jazzar indicated that the Maspero Triangle area is being developed, where the towers project is being implemented, and the project consists of a basement (underground garage) with a surface area of ​​19220 square meters, a capacity of 353 cars, and a ground floor (commercial) with an area of ​​16970 square meters, and a first floor (upper garage). ) With a surface area of ​​15,800 square meters, a capacity of 280 cars, and two towers for alternative housing for those who live in the “Maspero Triangle” area, agreed to return to it after its development, and each of them consists of 18 residential floors with a total of 468 housing units, the implementation rate is 80%, and a third tower with a height 23 residential floors with a total of 134 housing units, the implementation rate of which is 74%, and a fourth tower (administrative tower) consisting of a basement + a commercial ground floor, and 15 recurring floors, the implementation rate of which is 74%.

The Minister of Housing said: The project is also underway to develop the Maharaj al-Ayoun area, with an area of ​​95 feddans, and the development work includes the implementation of residential buildings, a hotel commercial mall, restaurants, cafeterias, tourist bazaars, and others. The concrete works have been completed, and the finishing works are underway in some buildings. Residential.

Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu
Among US Mod Menu